WIP Wednesday – 170301

carousel1.jpg

Happy March! Okay, so not a special month really but hopefully one for getting back on track.

This is the current progress on the Carousel CAL that I’m working on. I’ve not managed much since last time but my 3mo darling daughter seems to believe that naps are for the weak, and that bedtime routine is a game, so I’m not really getting any opportunity to do anything, let alone craft! I’ve managed some crafting time though.

I’m also working on a little cardigan for Temi, I’m not really sure that I like it so much but she needs cardis. I’m using some of the Rialto, though I haven’t managed to weigh that, I’ve used 39g of the Rialto. The cardigan is a knit pattern found in one of the Peter Pan books, called the Bubble Cardigan. I’ve only done the back so far so I’ll wait until I’ve completed a little more of it before posting photos, I like the effect of the stitch but I find it isn’t as effective on white yarn.

Current Totals:
Rialto: 4,095/4095g left (39g this week)
SSDK: 14,937/15,080g left (80g this week)

WIP Wednesday 01/02/17

Going by my stash on Rav rather than my original calculations, I have 4095g of Debbie Bliss Rialto left, and 15080g of Stylecraft Special DK left. I think that the Stylecraft includes a mas of waterfall, but still, that’s more than I originally had! Darn.

However, progress is being made, the Carousel CAL now looks like this:

imag2178

And I’m really just focusing on getting it finished now. I’m most of the way through the red bits of the current section (7/8 done) and will try finish that section this week [if Artemis lets me]

Totals from before the 1st of February:
Rialto: 4,095/4095g left (0g before this week)
SSDK: 15,017/15,080g left (63g before this week)

 

A generic update – Happy New Year!

ustemi
Our little family on Christmas morning.

I’ve been pretty busy recently, what with the baby, so I’m not being too hard on myself for not posting! 😉 The baby is doing well, she’s 8 weeks today and is cruising smack bang between the 91st and 95th percentiles, so she’s a big girl. She’s outgrown most of her 0-3mo clothes already! She’s smiling, cooing, playing with us and generally is ensuring that she has us wrapped around her little finger!

IMAG1680.jpg
Out in the pram with her Sherbet Rainbow Blanket.

So, a generic update. I finished the sage green cabled cardigan which was posted about in this post, which I’ll post about when I’ve blocked it and got photos. I started working on the Carousel CAL by Stylecraft, using SSDK rather than Batik as it’s the SSDK I have in bulk and am trying to get rid of! I am also working on a dress for Artemis, which was supposed to be a Christmas dress but I never finished it in time. I’m almost done now!

oreo

Before the year was out we had to say goodbye to our beautiful Oreo, she had numerous tumours which got so large that they were negatively affecting her quality of life, and so we made the decision to have her put to sleep on Thursday the 29th of December. Kozu has been acting weirdly for a couple of months now so we think that she may have something wrong with her, she certainly isn’t her usual self. The rest of the rats are all fine though, we’ve not introduced the two groups yet but we’re hoping too soon.

The baby is stirring so that is probably my cue, not that I can think of anything else to update with right now anyway! Happy New Year!

WIP Wednesday – 30/11/16

img_20161129_103017

I haven’t really been that active on the crafting side of things the past couple of weeks, however I have been chipping away at a little cardigan when I can! 

I have also decided, in my quest to rid myself of all of this yarn, that I will attempt the Carousel CAL, I had all but two balls, so for the greater good I went and purchased Aspen and Clematis on Monday from my local yarn shop (The Wool Cabin in Clacton-on-sea, it’s a lovely little shop and the staff are always helpful and friendly!) and I hope to start this blanket as soon as I’ve finished this cardigan.

The cardigan has the body complete, so I just need to do the sleeves now, which I’ll do in the next few days hopefully. I intend to do the sleeves on DPNs because of my massive hatred of stitching up, so we shall see how that goes. 

This weeks Rialto and SSDK totals come to:
Rialto: 4,254g/4382g left (50g this week)
SSDK: 12,217/12,255g left (+200g this week!) 

FO Friday – Sherbet Blanket & Hat for Baby

blanket2

blanket

It’s finished! Whoop! Baby has a blanket to come home from the hospital in. It’s actually smaller than I originally intended, but it’s the perfect size for the pram and car seat, so I’m really happy with it. I am hoping to whip up a big granny square or something over the next couple of weeks, but given that I literally have two weeks until my due date I think I’m pushing it slightly.

The colours are Stylecraft Special DK: Pomegranate, Spice, Citron, Spring Green, Cloud Blue, Lavender and Grape.

blanket1
There was some standing on small coffee tables involved here…

Project 5 out of 28 complete 🙂

Ravelry Pattern Page: Neat Ripple
Ravelry Project Page:
Nikki’s Sherbet Blanket
Direct link to pattern: Attic24 Neat Ripple Pattern

hat

I’ve also made a hat in the same colour scheme as the blanket, it’s just knit stripes rather than chevrons but it’s still cute, I’d like to attempt a matching cardigan too!

Project 6 out of 28 complete 🙂

Ravelry Pattern Page: Easy Hat (knitted in the round)
Ravelry Project Page: Nikki’s Sherbet Rainbow Hat

WIP Wednesday – 12/10/16

img_20161012_124609

So this week I have my usual two projects on the go still. I’m making some nice progress on the blanket, as you can see! I’m aiming for 5 repeats, which should make it around 90cm long, though I may stop at 4 repeats if it feels big enough, I want this one for the pram and in the car mostly, but it may be slightly too big for the car seat!

img_20161012_124703

And here is the jumper, which has both a front and a back now and part of a sleeve (well, a start on it!) I’m concentrating on the blanket at the moment as I realised that I haven’t actually made one for baby yet and so I’d prefer to have at least one finished by the time that they come along!

This weeks Rialto and SSDK totals come to:
Rialto: 4,374g left (4,382)
SSDK: 12,076g left (12,255)

 

WIP Wednesday

yarn
Not the lot of it O_O

Not your usual WIP today. My WIP for today has been sorting out my Stylecraft Special DK collection. I think that I managed to find all of it (though knowing me there are a few balls lurking in other places!)

It’s all been organised into under bed storage boxes by rough colour margins (reds, pinks and purples; blues and greens; naturals and white/grey/black; and yellows and oranges), unless it’s being used for a current project. I have 72 balls with the band intact, and 5055g of part-balls. So, in total, I have around 12.25kg of Stylecraft Special DK! I’m actually going to keep a running tally of how much I’m using in order to spur me on I think!

I’ve also tallied up the Debbie Bliss Rialto DK and I have 87 balls + 32g. So that makes 4382g of that too.

I really can’t store any more yarn at the moment, which means using up a lot of this stash. I knew that I had a lot but I’m somewhat surprised with the figures! Obviously I’ve challenged myself to make 28 things by my 28th birthday (May the 20th next year) but I have a feeling that a few of those projects will have to be big yarn-eaters! This isn’t even including the yarn that isn’t SSDK or Rialto, of which there is a bit of that too!

So this weeks totals on the Debbie Bliss Rialto DK and Stylecraft Special DK (which I will update each week from now on!) are:
Rialto: 4,382g
SSDK: 12,255g